One element, measured, when the builder says it is within tolerance.
An investigation measures the element against your engineering, AS 1684 for timber framing, AS 2870 for slabs and footings, AS 3700 for masonry, the National Construction Code and the Guide to Standards and Tolerances 2017.
0 checkpoints across 0 areas on a standard Edmondson Park defect investigation report. We need the property accessible and, on a new build, the site supervisor aware an independent inspector is attending. Whatever is blocked on the day gets recorded as inaccessible, never as checked.
Measurable items from Austral frame, lock-up and compliance records.










New Construction Stage Inspections Seven checks through an Edmondson Park build, read against your engineering.
Pre-Handover (PCI) Inspections Room by room, while your bargaining position is still intact.
Pre-Purchase Building Inspections A visual inspection to AS 4349.1 on stock built since 2012.
Building and Pest Inspections Both reports from one attendance, on a suburb with nothing older than 2012. Instant online pricing, or talk to the booking team on 1300 471 805.
A stage inspection covers everything visible at a point in the build. An investigation answers one question, in whatever depth the question needs, because it is usually being written for a disagreement.
It is normally where the file starts. A tribunal generally wants an expert witness report drawn to its practice note, which we prepare separately.
No. What we do is set down the finding and the requirement it falls short of. Certifying a structural remedy is an engineer's function, and the report says when one is required.