Waterproofing inspection in Edmondson Park

The membrane examined while it is still a membrane.

  • After the membrane is applied and before any tile is laid
  • About 1 hour on site
  • Report within 24 hours
Price your Edmondson Park inspectionSend the address and the stage you are at.

Fully licensed & accredited

Stage6 of 7
When to bookAfter the membrane is applied and before any tile is laid
Time on siteAbout 1 hour on site
Inspected againstAS 3740 (waterproofing of domestic wet areas), AS 3958 (tiling), NCC Volume Two Part 10.2

What is included in a Edmondson Park waterproofing inspection

  • Membrane coverage across the floor and up the walls
  • Wall upturn heights at the shower and against hobs
  • Hob, threshold and step-down details
  • Bond breakers at wall and floor junctions
  • Floor waste flange bedded and sealed to the membrane
  • Falls to the floor waste and shower screed
  • Penetrations for taps, wastes and shower rails sealed
  • Membrane cure, damage and coverage before tiling
  • Primer and substrate preparation where visible
  • Set-down depth against the finished floor level
  • Junctions to baths, screens and vanities
  • Laundry, powder room and ensuite treated to the same standard
Why it matters here

Waterproofing inspections on Edmondson Park builds

Wet area rectification is the most expensive defect category in a new home, because reaching a layer worth a few hundred dollars means taking a finished room apart. The Austral records carry both ends of that story: a shower recess trimming item at frame stage and a shower area recorded at lock-up, then inadequate sealant at a bath, inconsistent sealing and defective grouting at handover. Every photograph here was taken in Austral, roughly six kilometres north west of Edmondson Park and in the same growth corridor. We would rather name the suburb than let another job read as local.

What we find at this stage in Edmondson Park

  • Coverage short at walls and terminations
  • Junctions and penetrations not sealed
  • Falls not carrying water to the waste
  • Shower recess set down and trimming
  • Membrane damaged before tiling begins
Grouting and joints defective, Austral, Edmondson Park
Grouting and joints defective, Austral
Sample findings

Sample defects found during our waterproofing inspections in Edmondson Park

Annotated findings from Waterproofing inspections on Edmondson Park builds. Client addresses withheld.

Shower area, recorded during a lock-up inspection in Austral
Shower area recorded at lock-up, Austral
Shower recess trimming required, recorded during a frame inspection in Austral
Shower recess trimming required, Austral
Inadequate sealant, recorded during a handover inspection in Austral
Inadequate sealant in a wet area, Austral
Inconsistent sealing, recorded during a handover inspection in Austral
Inconsistent sealing at a bath, Austral

The other stages of a Edmondson Park build

  1. Bored piers inspection in Edmondson Park1Bored piersAfter boring and cage placement, before concrete
  2. Slab pre-pour inspection in Edmondson Park2Slab pre-pourThe day before the pour, steel and formwork complete
  3. Frame inspection in Edmondson Park3FrameOnce frame and trusses are up and the roof is on, before lining
  4. Lock-up (pre-plaster) inspection in Edmondson Park4Lock-up (pre-plaster)After roof, cladding and external doors, before plaster
  5. Fixing inspection in Edmondson Park5FixingAfter mouldings, doors and joinery, before the painter
  6. Pre-handover (PCI) inspection in Edmondson Park7Pre-handover (PCI)Two to three weeks before your handover date

All construction stage inspections in Edmondson Park →

Guides

Construction stage guides for Edmondson Park

All guides →

Book a waterproofing inspection in Edmondson Park

Instant online pricing, or talk to the booking team on 1300 471 805.

FAQ

Waterproofing inspections in Edmondson Park: common questions

Which standard applies?

AS 3740 for domestic wet areas, alongside the National Construction Code and the ABCB Housing Provisions.

Do you flood test?

No. A flood test cuts into the waterproofer's own process and their warranty, and it belongs with them.

How narrow is the window?

Often two or three days between the membrane curing and the tiler starting, which is why the booking has to be made in advance rather than arranged on the day.

How does a failure appear later?

A damp skirting or a stain on the wall of the adjoining room, a year or two after you move in, always behind finished tiling.

And if tiling is underway already?

Whatever remains open gets assessed, and the sections already closed are listed as such.

Who fixes it?

That falls to the builder, who has to get the waterproofer and tiler back in the right order. The report gives the location and the clause rather than an opinion.