Depth, diameter and cage, confirmed while the bore is still open.
One of our inspectors will call you back.
If it is urgent, email [email protected]
Fully licensed & accredited
NSW Fair Trading
Australian Society of Building Consultants
Strata Community Association
Building Dispute Practitioners Society Piers turn up on Edmondson Park lots where the footing has to reach past fill, and on land that spent half a century as an army camp there is fill in places you would not predict. Depth is the whole exercise, and concrete ends any chance of confirming it.

Annotated findings from Bored piers inspections.




2Slab pre-pourThe day before the pour, steel and formwork complete
3FrameOnce frame and trusses are up and the roof is on, before lining
4Lock-up (pre-plaster)After roof, cladding and external doors, before plaster
5FixingAfter mouldings, doors and joinery, before the painter
6WaterproofingAfter the membrane is applied and before any tile is laid
7Pre-handover (PCI)Two to three weeks before your handover dateInstant online pricing for Edmondson Park, or contact the booking team.
Under an hour on a typical lot, longer where there are many piers or the site is spread out.
The measured depth goes in beside the required depth. The remedy is between your builder and their engineer, and the report gives them the figure.
No. We record against the engineering. Certification is an engineer's function and the report says when one is needed.
Because filled and disturbed ground behaves differently from natural ground, and the engineering for a lot is drawn from a soil report that takes account of it. That is what we check against.
Rarely. Pier depth is the concreter's own record too, and a second set of measurements on the day protects everybody.
Your lot engineering, with pier depths, diameters and positions marked.